Neil Road – Moana/Airway to Gentry

BID 212048
Washoe County NV
Due Date : Ongoing

Project Description & Purpose The project improvements will include reconstruction and rehabilitation of the existing roadway section. Incidental work will involve adjustment of manhole and valve covers, permanent striping, and replacement of concrete curb, gutter, sidewalk, and driveway apron, as necessary. In addition, the turn radius at Gentry and Terminal will be smoothed out slightly. Bike lanes will be added on Terminal Way and Neil Road by re-configuring the existing striping. Sidewalk is planned on both sides of Gentry, but there is not enough room for addition of bike lanes. Bike traffic on Gentry Way will share the travel lanes with the vehicular traffic. Sharrow pavement markings will be installed to alert motorist of this condition.

Original Post: Visit Post
Original Document: Visit Document

Working With: Washoe County

Entity Contact: Elisa Rizzo
Email: erizzo@rtcwashoe.com