Building, Architecture, Construction and Renovation

All work required for maintaining and controlling traffic during the construction period shall conform to the project plans, the applicable provision of Section 7-10 of the Standard Specifications and these modifications. All such work shall additionally conform to Work Area Traffic Control Handbook (WATCH) published...

The City Hall Annex & Building Envelope Project includes the renovation of the city hall's exterior waterproofing & envelope system plus the replacement of the concrete surface deck of the City Hall Annex Building. Trade subcontractors are required for the following bid packages: 100A...

The Request for Qualifications (RFQ) provides the application for contractors to be placed on the Pre-Qualified List (PQL) which is established and maintained by The Department of Design and Construction. Qualified firms are encouraged to take advantage of this opportunity to submit applications detailing their...