Building, Architecture, Construction and Renovation

Proposed work includes removal of one existing 50-ton air cooled condensing unit (CU-3); removal of vibration isolator; partial removal of refrigerant piping; partial removal of electrical power and control conduit and wiring; installation of City-provided replacement condensing unit; related plumbing piping, including extending refrigerant piping...

BID OPENING DATE: September 8, 2010 PREQUALIFICATION REQUIRED: YES ADVERTISED DATE: JULY 7, 2010 CFDA#'s 20500 and/or 20507 F.T.A. No(s): CT-05-0105 and/or CT-90-X507 F.T.A. Funding 80% CONTRACT GOAL = 8 %DBE Project No(s): 301-0072: Towns of Bridgeport, Milford & Norwalk; Replacement of Wayside Electric Traction...

Project information regarding the Joint Base Anacostia-Bolling (JBAB) Overflow and Diversion Structures (JBAB-ODS) project will be presented at this Industry Outreach Meeting. The JBAB-ODS will capture flow from the Potomac Outfall Sewers and convey it to the Blue Plains Advanced Wastewater Treatment Plant. Construction associated...