Building, Architecture, Construction and Renovation

asphalt concrete sawcutting; concrete saw-cutting; demolition, removal and disposal of existing concrete sidewalk, curbs, gutters, existing base material, and asphalt concrete pavement; removal of existing landscaping and hardscape in the public right-of-way; root pruning; preparation of sub-base and base; installation of accessibility ramps; preparation of sub-base...

The City is requesting formal proposals for a design-build team to design and construct two spillways based upon Urban Drainage standards. The design-build team shall provide all survey, environmental and geotechnical evaluation, civil design and construction necessary to complete a seamless, cost-effective, and timely...

This alternate contract source (ACS) is intended for elevator maintenance, including monthly inspections, testing services, and periodic preventive maintenance. Elevator repairs are not covered under this contract. This agreement uses DMS Departmental Purchasing RFP #DMS 14/15-049 competitively solicited contract and is available for...

The scope of work consists of replacing the electrical, electronics, and civil infrastructure in PATH's under-river Tunnels E & F between Exchange Place and the World Trade Center. This infrastructure was damaged as a result of Hurricane Sandy.The Work will include removal and replacement of...