Building, Architecture, Construction and Renovation

The scope of this procurement consists of :A. Building Automation System (BAS), utilizing direct digital controls.B. Furnish all labor, materials, equipment, and service necessary for a complete and operating Building Control System (BCS), utilizing Direct Digital Controls (DDC) as shown on the drawings and described...

The scope of work consists of replacing the electrical, electronics, and civil infrastructure in PATH's under-river Tunnels E & F between Exchange Place and the World Trade Center. This infrastructure was damaged as a result of Hurricane Sandy.The Work will include removal and replacement of...