Building, Architecture, Construction and Renovation

In general the work consists of replacement of cell front doors, operators, locking mechanisms, ADA improvements, replacement of plumbing improvements, electrical upgrades, telephone upgrades,heating and ventilation improvements including an air handling unit replacment, security camera monitoring and recording improvements, fire suppression system, a smoke control...

In general the work consists of demolition of two instructional labs (Greenquist 220 and 370) and associated areas. Reconfigure and renovate the labs including new lab casework and hoods. Provide new and/or tie into existing services and utilities."Please see bid link for more information"https://wisbuildnet.wi.gov/(S(lo1ufd5lmxvzifbsuntuazj2))/public/bid_documents.aspx?projnum=18H1Y%20GPC...

In general, the work consists of renovation of Building, approximately 27,000 sf, to update building environmental systems and building space layout. Work includes, but is not limited to demolition of interior and exterior elements, roof system replacement, masonry and metal stud/gypsum board walls, replacement of drill...