Winter Construction
Due Date : Ongoing

The proposed construction is multi-phased and will include a new track and soccer field with bleachers, retaining walls/planted terraces. and a two-story field house, three new parking fields, a covered basketball/outdoor event facility, a cooling tower, a three-story CoLAB building and three parking fields. An...

Winter Construction
Due Date : Ongoing

The Project consist of the general renovation and addition to an existing 66,520 SF elementary school located at 1891 Johnson Road, N.W. Atlanta, Georgia 30318. The current FTE is 445. The site contains approximately 19.8 acres of land . The building is two story concrete...

Winter Construction
Due Date : Ongoing

The project is a shell and core renovation of the three story 31,800st Olympia building. Includein the renovation is an extensive structural update including replacement of the majority of interior colums and floor/roof slabs, repalcement of all storefront and windows and a new membrane roof...