AllGovBids.com

Business Opportunity Network

Providing all the government bid & RFP opportunities in your area or industry.

ALL SERVICES

FIND YOUR SERVICE

YourGovBids.com

Business Opportunity Network

Providing all the government bid & RFP opportunities in your area or industry.

FIND YOUR SERVICE

[wpdreams_ajaxsearchlite]

How It Works

Connecting businesses with the bids that matter to them.

Select Your Service

Find the right service site for you. Get all the bids in your city or region, or select an industry-only site and get bids nationwide.

Start Your Free Trial

Every account begins with a 7 day free trial. If you like our service, continue your account with an affordable subscription.

Access All Bids

Search for bids in your industry or area, access extensive bid & RFP details, and get bid updates in your inbox every day.

Find Your Service

All The Bids, One Place

Stop going to multiple sites for bids. Select your area or industry coverage site, and get all the bids in one place.

SouthEast Connector

The SouthEast Connector (SEC) is a regional roadway that will run from the intersection of Sparks Boulevard and Greg Street in the north, to South Meadows Parkway and Veterans Parkway in the south. It is a six lane non-elevated roadway with multi-use paths. The SEC is a vital link that connects the south part of the Truckee Meadows with the east part of the Truckee Meadows. The only other continuous link that serves this purpose is US-395 to I-80, which is reaching critical capacity. All other regional roads in the southeast part of the Truckee Meadows are also reaching critical capacity. The SEC provides much needed relief to the entire transportation network.The SEC is a regional roadway that has been planned and discussed for over 40 years. Developments in south Reno and Sparks have been approved because the SEC is on the Regional Transportation Plan. Existing new roadways have been approved for future capacity needs assuming the SEC is built. If the SEC is not built, those roadways do not have the ability to handle additional capacity without major impacts to homes, apartments, businesses, etc.

MASTER PLAN THREE DIMENSIONAL (3D) VIDEO RENDERING

MASTER PLAN THREE DIMENSIONAL (3D) VIDEO RENDERING, RFP NO. 18027 Sealed proposals will be received by the Director of Finance at his office at Solon City Hall, 34200 Bainbridge Rd, Solon Ohio, 44139 until contracted for Master Plan Three Dimensional (3D) Video Rendering, in accordance with the Plans and Specifications which are available for inspection in the Finance Department located at Solon City Hall, 34200 Bainbridge Road, Solon, Ohio 4413 "Please see bid link for more information" https://www.solonohio.org/bids.aspx?bidID=248

Traffic Signal Timing 3

Project Description & Purpose The Signal Timing 3 project is the latest in a series of projects to help local agencies re-time traffic signals in the region. This project consists of 147 intersections that will have new timing implemented in the period between February and June of 2013. The project is funded through the Congestion Mitigation/Air Quality (CMAQ) program. Schedule of work include: ? Collect traffic & signal data ? Evaluate existing signal timing & develop new timing at 140 intersections ? Implement timing in the field ? Fine-tune timing ? Conduct before-after studies

Warren County Courts Office Building Project

Warren County  Board  of Commissioners  intends to construct a  new Warren County Courts Office Building  on our Governmental Campus in Lebanon, Ohio. This new facility is currently planned  to be  approximately 45,000  total square  feet on three levels. The building will have 15,000 gross square feet per floor and consist of two­ stories above grade with conditioned and partially finished basement level. The facility will house relocated Warren County offices and include the WC Prosecutor's Office, WC Board of Elections Offices and Storage, Common  Pleas Court Pre­Trial &  Probation Offices, and the  WC Emergency Services & Dispatch Center. In addition, a  portion of the  building's square  footage will be  planned  as shell space  for future  expansion or storage